CMGT 701: Construction Planning and Scheduling (3)

An introduction to the planning and scheduling of projects, for both construction and design. Emphasis is placed on the critical path method including network development, production of time schedules, time-cost considerations, and the efficient utilization of resources. Manual and computer techniques are covered. Prerequisite: CMGT 500 or CMGT 700, and MATH 526 or EMGT 802, or consent of instructor. LEC
View current sections...